CHALLENGES
Initially, our challenge was transitioning the fixture program in time for two fast-approaching store openings without the benefit of complete and accurate working drawings.
The ongoing program challenges were:
- To implement design and quality improvements
- To develop and to produce new fixtures consistent with the existing concept
- To create systems that generate orders and verify self management of the program
- To deliver and to install new stores and remodels correctly, on time, and on budget
PROCESS
We utilized a combination of client input, previous generation fixtures, and incomplete working drawings in order to meet the initial two store timeframe.
For the ongoing program we:
- Created working drawings and re-designed selected fixtures
- Established a process for plan take-offs, ordering, procurement, scheduling, and production specific to the program
- Provided a broad range of fixtures including casework. wall systems, floor fixtures, and hardware
- Planned and executed logistics and shipping to maximize loads and field efficiency
- Installed products with field verification by Ross Display's Install Manager and Client Manager
- Developed and produced new fixtures
- Audited the program for compliance with internal standards
- Created information and reporting systems for client review
RESULTS
- To date, Ross Display has successfully installed approximately 30 new stores averaging 13,000 sf.
|
 |

 Nike New Store - Center Element Area
 Nike New Store - Cash Wrap Area
|