Nike Remodels

Printer Friendly
Case Studies:
»Nike Remodels
Capabilities Utilized:
·Program Management
·Concept Development
·Design & Engineering
·Prototyping
·Order Management
·Production
·Logistics & Inventory Management
·Installation

 

CHALLENGES

Our existing store remodel program challenges included:

  • Implementing design and quality improvements consistent with the new store program
  • Developing and producing new fixtures consistent with the existing concept
  • Creating systems that would generate orders and verify self management of the program
  • Delivering and installing remodels correctly, on time, and on budget

 

PROCESS

We utilized a combination of client input, previous generation fixtures, and incomplete working drawings in order to produce items for the remodel program. For the remodel program we:

  • Created working drawings and re-designed selected fixtures
  • Established a process for plan take-offs, ordering, procurement, scheduling, and production specific to the program
  • Provided a broad range of fixtures including casework. wall systems, floor fixtures, and hardware
  • Planned and executed logistics and shipping to maximize loads and field efficiency
  • Installed products with field verification by Ross Display's Install Manager and Client Manager
  • Developed and produced new fixtures
  • Audited the program for compliance with internal standards
  • Created information and reporting systems for client review

 

RESULTS

To date, we have successfully:

  • Installed approximately 40 remodel stores

 



Nike Remodel - Floor & Wall Fixtures
 

Nike Remodel - Center Element